HDD Projects | Simplex Electricals

Projects

HDD Projects

Trenchless crossings executed under active railway corridors, highways and coastal terrain.

HDD rig positioned for a trenchless crossing

10 contracts listed · 29,152 m of trenchless drilling

HDD projects
Name of contractProject descriptionTrenchless drillingLocation
Modification & Energization of 11kV & 33kV Overhead Line Crossing to Underground CableExecuted large-scale trenchless underground conversion of live 11kV and 33kV railway power crossings through micro-tunnelling and HDD methods. The scope included precision bore installations beneath railway tracks and roads, followed by integration with overhead networks, XLPE terminations, and protection systems to ensure compliant railway-grade energization.2,370 mBhojudih, Asansol, Bankura – WB
Adra PLC Underground Conversion (Phase-D)Delivered Horizontal Directional Drilling based undergrounding of 11kV power line crossings using HDPE casing pipes up to 250 mm diameter under active railway corridors. The project involved structural pole modifications and electrical interface works post-trenchless installation, ensuring safe energization under railway authority coordination.4,050 mMahuda, Bhaga, Dhanbad – JH
Conversion of 11kV Overhead Crossings – Chakradharpur DivisionExecuted extensive micro-drilled and HDD trenchless construction to replace overhead 11kV railway power lines with underground cable systems. Electrical integration included HT terminations, jointing, gantry modifications, and earthing compliant with railway standards.2,700 mAdityapur, Chaibasa, Tata – JH
33kV Undergrounding Against Infringement – Bondamunda YardImplemented high-capacity HDD and micro-drilled trenchless crossings for 33kV cable infrastructure within operational railway yards. The project focused on underground corridor creation, followed by XLPE terminations, gantry integration, and fault diagnostic support systems.3,560 mRourkela – OD
Conversion of Railway-Owned 33kV Crossings – CKP DivisionDelivered HDD-based underground conversion of 33kV overhead power lines across railway track crossings. The trenchless scope included casing installation, and structural works for safe overground transition.1,800 mKendujhar, Rourkela – OD / Jamshedpur – JH
33kV Sectional Isolation & Tunnel Electrification – CKP DivisionExecuted trenchless crossings and underground cable routing for 33kV sectional isolation across multiple railway locations. The work included long-distance directional drilling under sensitive terrain, followed by HT/LT power distribution integration and substation interface works.3,400 mSingbhum, JH
Coastal Belt Underground Conversion – Srikakulam (Waltair Division)Delivered coastal HDD trenchless installations replacing overhead railway distribution lines with underground systems. The work included long-distance directional drilling under sensitive coastal terrain, followed by HT/LT power distribution integration and substation interface works.622 mSrikakulam, AP
Coastal Belt Underground Conversion – Vizianagaram (Waltair Division)Executed trenchless HDD crossings for conversion of overhead lines to underground cable networks in coastal railway zones. The project emphasized bore stability, underground corridor engineering, and high-capacity feeder integration post-installation.1,450 mVizianagram, AP
GVS Projects Private LimitedHDD and trenchless installations for various kinds of pipes and utility installations.8,000 mVishakhapatnam, AP
Sainik Mining & Allied Services LimitedUndergrounding of NTPC's 33kV overhead power lines to enable mining operations.1,200 mTalcher, Odisha

Get in touch

Send us the crossing. We will send back a method.

We bring strong on-ground execution capabilities, modern equipment, and structured workflows to your electrical and HDD projects.

Scroll to Top